|
Last Modified: 11-29-2007 |
1.6 A |
|
Service Category: Engine/Hybrid System |
Section: Starting |
|
Model Year: 2008 |
Model: Sequoia |
Doc ID: RM000002MDK00BX |
|
Title: 3UR-FE STARTING: STARTER: INSTALLATION (2008 Sequoia) |
INSTALLATION
1. INSTALL STARTER ASSEMBLY
|
(a) Install the flywheel housing side cover.
|
|
(b) Install the starter with the 2 bolts.
Torque: 37 N·m (377 kgf·cm, 27 ft·lbf)
|
|
(c) Install the water by-pass pipe bolt.
Torque: 18 N·m (184 kgf·cm, 13 ft·lbf)
|
|
(d) Install the starter wire with the nut.
Torque: 9.8 N·m (100 kgf·cm, 87 in·lbf)
|
(e) Connect the starter connector.
2. INSTALL STARTER COVER
|
(a) Install the starter cover with the 3 bolts.
Torque: 12 N·m (122 kgf·cm, 9 ft·lbf)
|
3. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY RH
4. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR
5. INSTALL FRONT NO. 3 FLOOR HEAT INSULATOR
6. INSTALL FRONT EXHAUST PIPE ASSEMBLY
7. INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE
(a) Apply a light coat of engine oil to a new O-ring.
|
(b) Install the O-ring to the guide.
|
(c) Install the dipstick guide with the bolt.
Torque: 10 N·m (102 kgf·cm, 7 ft·lbf)
(d) Connect the wire harness clamp.
(e) Install the dipstick.
8. INSTALL FRONT FENDER APRON SEAL RH
9. INSPECT EXHAUST GAS LEAK
10. INSTALL NO. 1 ENGINE UNDER COVER
11. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 5.4 N·m (55 kgf·cm, 48 in·lbf)
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected
.
|